Step by Step - How to Build a House
Watch on YouTube →
Overview
This video outlines the step-by-step process of constructing a house, beginning with site preparation and underground MEP (mechanical, electrical, plumbing) utilities, progressing through slab pouring with grounding considerations, framing, rough-in inspections, drywall, and culminating in the trim-out phase. It emphasizes the importance of scheduling and inspections at each stage to ensure safety and code compliance, with a focus on electrical service inspections and obtaining a certificate of occupancy (CO) before move-in.
Key takeaways
- Site preparation involves installing underground MEP utilities before pouring the slab to avoid costly rework later.
- Electricians ground slabs using methods like Ufer grounds, turning the rebar into a large Earth electrode.
- Temporary power setups (T-poles) must adhere to local authority guidelines, such as Austin's GFCI and WRTR receptacle requirements, and pass inspection before energization.
- MEP rough-in should be strategically sequenced, with electrical work often following plumbing and HVAC to minimize potential damage.
- Electrical service installations often require a separate inspection before the final inspection, allowing permanent power to be established earlier.
- A certificate of occupancy (CO) inspection ensures the building is safe and ready for move-in, covering aspects beyond specific trade codes, like smoke detector placement.
Chapters
- Site prep involves flattening the building surface and preparing the site for a slab or pier and beam foundation.
- Underground MEP utilities, including electrical conduit from transformers to service locations, are installed during site prep.
- Electricians install underground conduit for power to panels, garages, and kitchen islands before the slab is poured.
- The slab phase involves framing the slab structure, putting in rebar for rigidity, and filling with concrete.
- Electricians ground the slab by running a conductor and attaching it to the rebar, creating an Earth electrode using methods like a Ufer ground.
- Temporary power is established using a T-pole with a disconnect, meter, and receptacles, inspected by the city or power company according to local guidelines like Austin's.
- Temporary lighting is provided, especially in remodels or structures lacking natural light.
- Framing duration varies based on structure complexity and potential environmental concerns, such as protected species.
- After framing, MEP contractors begin the rough-in stage, pre-wiring and running utilities through walls and ceilings.
- Waiting for plumbing and HVAC to complete before electrical work minimizes damage to wiring.
- Exterior house wrap, including green board and moisture barriers, is typically installed before rough-in.
- After MEP rough-in inspections, drywall is installed, taped, mudded, and textured, followed by cabinet and door installation.
- Painters apply primer and finish coats, after which MEP contractors return for the trim-out phase, installing devices and trims.
- Electrical trim-out includes installing the electrical service, which requires a separate service inspection in some areas like Austin.
- Final inspections by city inspectors or fire marshals ensure code compliance and readiness for occupancy, leading to the certificate of occupancy (CO).